Sewing: 1 zipper on a baby dress, 1 baby dress needing put together, 1 baby coat before May, 2 dresses that need zippers (by monday), 2 skirts that need zippers (by monday), 1 dress that needs hemmed, 2 white lab coats (by monday), 1 white apron (by monday), two sleeves on suit coat, 1 pair of suit pants, 2 suit skirts, 1 suit jacket, 1 jacket that needs sleeves, 1 top, 1 pair of jeans needing a pocket fix, 1 quilt to finish quilting, 3 quilts to finish putting together, 1 bunny that needs a hole sewed shut
Total: 23
Cross-stitch: 1 "Baby Princess", 3 Christmas Stockings, 1 Cat Ballerinas (probably won't finish), 1 Ocean Creatures (probably won't finish), 1 Handfasting (which needs to be done by next October...I better get on it or send it to Laura) I'm not counting the others since I haven't started them
Total: 7
Craft: None (WHOOT WHOOT!)
Beading: NONE (WHOOHOOEEEE!) I gave them all to my friend and they are now gone gone gone!
Grand Total: 30. Wow, I thought it was going to be much worse. I guess I'm getting a move on this year.
Showing posts with label sewing. Show all posts
Showing posts with label sewing. Show all posts
Friday, April 9, 2010
Monday, January 18, 2010
Projects
I'm a project hoarder. I truly am. I have so many projects in my 'to be finished' stash I can't even count them all. At least 10!! My goal is to get at least half of them done before we move again; despite what my inner voice is saying to the contrary. That's the goal. I want to lesson my project load by half by the time we move again in July. We're moving regardless of whether or not my husband finds a new job. If he finds a new one then, "YEAH! We're moving out of state!" If he doesn't then, "YEAH! We're moving out of this frigging apartment...to another frigging apartment." Either way though, we're moving. So of course this means that I've started packing already.
No, you didn't read that last part wrong. I've started packing already. I think I have 10 or 11 boxes packed and stacked in the second bedroom. I'm really anal retentive this way. As soon as winter is over I'll probably pack all of our winter gear in a box too. When we search for new jobs if we find one the first thing I do is to go on Rent.com and search out prices on apartments. Then I go and find out about the city, where the best places to live are, where the apartments are in comparison to the high school, what the mean income of the state is, if there's a state income tax and how much it is...etc. I have checklists. I have checklists of places to search for jobs once a week. I am totally nuts; but my husband just says I'm "driven." Isn't he such a good guy?
Back to the topic: projects! I think, for my own curiosity I will try to list what I have to do in categories...
Cross Stitch - 3 stockings (one is in the finishing stages), 3 wall art ones, 1 from my great grandmother that she never finished. Total: 7 (YIKES)
Sewing - 2 jackets that need sleeves, 1 skirt, 1 pair of pants, 1 jacket to put together entirely, 3 Halloween costumes for next year (not sure how much that counts since I just got patterns today), 2 quilts that need quilting, 2 quilts that need to have more blocks put together, 1 angel wall hanging, 4 pants that need hemming or buttons or pockets fixed. Total: 17 (Oh. My. Goodness. What was I thinking?!!?)
Craft - 1 beaded necklace, 1 set of letters to string up for my daughter, 2 picture frames to paint. Total: 4 (Much better than the last two!)
Grand Total: 28 So, I need to bring that number closer to 14 by the time we move. Okay, so that's...5 months so if I do 2 to 3 a month I might achieve my goal of finishing half. We'll see. Maybe. Is this possible with an 8 month old?!?
No, you didn't read that last part wrong. I've started packing already. I think I have 10 or 11 boxes packed and stacked in the second bedroom. I'm really anal retentive this way. As soon as winter is over I'll probably pack all of our winter gear in a box too. When we search for new jobs if we find one the first thing I do is to go on Rent.com and search out prices on apartments. Then I go and find out about the city, where the best places to live are, where the apartments are in comparison to the high school, what the mean income of the state is, if there's a state income tax and how much it is...etc. I have checklists. I have checklists of places to search for jobs once a week. I am totally nuts; but my husband just says I'm "driven." Isn't he such a good guy?
Back to the topic: projects! I think, for my own curiosity I will try to list what I have to do in categories...
Cross Stitch - 3 stockings (one is in the finishing stages), 3 wall art ones, 1 from my great grandmother that she never finished. Total: 7 (YIKES)
Sewing - 2 jackets that need sleeves, 1 skirt, 1 pair of pants, 1 jacket to put together entirely, 3 Halloween costumes for next year (not sure how much that counts since I just got patterns today), 2 quilts that need quilting, 2 quilts that need to have more blocks put together, 1 angel wall hanging, 4 pants that need hemming or buttons or pockets fixed. Total: 17 (Oh. My. Goodness. What was I thinking?!!?)
Craft - 1 beaded necklace, 1 set of letters to string up for my daughter, 2 picture frames to paint. Total: 4 (Much better than the last two!)
Grand Total: 28 So, I need to bring that number closer to 14 by the time we move. Okay, so that's...5 months so if I do 2 to 3 a month I might achieve my goal of finishing half. We'll see. Maybe. Is this possible with an 8 month old?!?
Labels:
apartments,
craft projects,
cross stitch,
goals,
jobs,
moving,
packing,
quilts,
sewing,
www.Rent.com
Subscribe to:
Posts (Atom)